Up foundation Prev Next Slideshow

 Previous image  Next image  Index page
005 excavating
006 digging
007 trench
008 insulation
009 drain
  010 rubble.jpg - The last section of trench to be filled before the grade beam is formed.  
011 mixing
012 curing
013 compacting
 
 

The last section of trench to be filled before the grade beam is formed.
Total images: 13 | Last update: 1/2/08 2:32 PM | Help